First-Run Setup — Administrator Guide

Two screens stand between a new tenant and a working Arcvue: the Setup Wizard, which connects your systems and maps your accounts, and the Questionnaire, which tells the forecast how your business actually behaves. Neither is a form to rush.

Where they are: the Setup Wizard at Onboarding; the Questionnaire at Setup → Questionnaire.

A link to one particular step does not work — and nothing tells you so. If you are on step 3 and copy the address out of your browser to send to somebody, they will land on step 1. No error, no warning, on either end. Send them to Onboarding and say which step to click in the sidebar.


Complete your setup — what is still not done​

Where it is: Complete your setup in the top bar, beside the product tabs. It shows to an administrator while anything required is not done, and its hover says how many items are left. The page itself is at Setup.

This is the go-live list. It holds the items a company must answer before its books are right from the start — who the legal entities are, who approves timecards and bills, the accounts the ledger posts through, when the books begin, what each subledger's control account held on that day, and the connections Arcvue reads from. Nothing on it is a box someone ticks: Arcvue reads your own data for each item and says one of three things.

  • Done — the thing is in place. Review opens the control that set it.
  • Not done — the sentence under it says exactly what is missing. Set up opens the control that fixes it.
  • Does not apply — your company has no use for it (for example, a connection to an outside ledger when Arcvue keeps your books itself). There is nothing to do and no link.

First steps sit above the list until the company goes live: who your company is and where its numbers come from, the same things the Setup Wizard asks. Each open step says what is Still needed, and its Set up link opens the page where it is set. A step counts once what it asks for is saved, wherever you saved it.

Below them the items are grouped in the order to work them: Connect (the systems Arcvue reads from), Your company (its legal entities, its divisions and the names on its invoices and 1099s), Your books (when they begin, the accounts they post through and your cost pools), Time and leave (the calendar your people enter time against and the kinds of leave you offer) and Your people (who signs in, who is on the payroll, the leave they earn and who approves). An item still to do says why it matters and about how long it takes. The item marked Next is the first one you can start now, and an item that waits on another says Do this first and links to it.

The line under the title is the go-live answer. Ready to go live appears only when every item that applies is done, first steps included, and the line below it says about how much time the open items take in all. If some items are in areas your role cannot open, the page counts them and says so rather than leaving them out — so it never reads as ready while something you cannot see is still missing. An administrator completes those.

Fix an item and come back: the page reads your data again, so the item moves to Done on its own.

Where a new company's administrator lands​

Until the company goes live, an administrator who opens the Dashboard or Accounting is brought to this page: it is the one list of what is left. The Setup Wizard is still at Onboarding and asks for the same first steps; each step's Set up link here opens the page where it is set.

Go live​

Go live, under the title, records that your setup is finished. It shows until the company is live and opens once every item that applies is done; until then the line beside it reads Go live opens once every item that applies is done. After it, administrators land on their usual page instead of this list. Nothing about your data or settings changes, and every setting can still be changed afterwards.

The Setup Wizard's last step ends the wizard, not setup. While items here are still open it says so (Finishing the wizard does not finish setup: each item left is on Complete your setup, with what it needs.), its button reads Finish the wizard, and pressing it brings you to this page.

Working down the list​

The list is in the order to work it, so working down it means nothing waits on something not yet in place. Each item's Set up link opens its page; this is where each group lives and what to know before you start it:

  1. Connect. If another system keeps your books, its connection and first sync come first; the nightly work that keeps Arcvue current waits on them.
  2. Your company. Primary legal entity, Entities we keep books for, Invoice issuer identity and 1099 payer, contact and signer are all on Settings › Company › Legal entities (see Legal Entities); the first save asks why, as every later change does. Then Divisions.
  3. Your books. Ledger start date (the day your books in Arcvue begin), then Structural account roles: a starter chart sets cash, receivables, payables and deferred revenue, and the rest are chosen on Settings › Accounting & close › Account mapping, with Forecast line → GL account on the same page. The balances you carry in go on the Opening balance sheet, below the start date on Settings › Company › Profile; the list asks for it right after the start date. Then Subledger control accounts and opening balances: for each subledger, its control account and what that account held on the day your books begin. Cost pools are set on Settings › Rates & compliance › Cost pools; leave types and the people workbook need them, and loading a starter chart does not create them.
  4. Time and leave. Pay periods, Holiday calendar (creating one adds the federal holidays), Labor categories (it applies once a contract is billed by the hour), Leave types (a type takes hours only once it has a pool and an account) and Advance and LWOP policy.
  5. Your people. Users and roles: Add User asks you to set each person's password; to send people an invitation instead, bring them in through Settings › People & security › Provisioning & import, which is also Bulk hire / roster. The workbook offers your leave plans, contracts, roles, labor categories, indirect pools and divisions, and the page names any of those lists that is still empty, with a link to where it is filled. If your payroll provider is connected, its roster sync brings people in. Then Leave plans and assignments, which reads done once people are assigned, Who approves a person's timecards, AP bill approval and separation of duties, which is one choice, and Who may charge what, which needs both contracts and people. Contracts are added under Accounting › Contracts.

If Arcvue does not keep your time, or your books​

If your people record time and leave somewhere else, turn off Time and leave are kept in Arcvue on Settings › Time, leave & payroll › Pay periods & workweek. Seven items then read Does not apply: who approves timecards, pay periods, the holiday calendar, who may charge what, leave types, leave plans and the advance policy.

If another system keeps your books and Arcvue Accounting is not switched on for your company, every item that belongs to Arcvue Accounting reads Does not apply and says why: the ledger start date, account roles, subledger ties, the invoice issuer and 1099 payer, AP bill approval, the legal entities, the roster and cost pools, and with them the time and leave items. What is left is what Arcvue needs to read your system and plan from it.


Part 1 — The Setup Wizard​

It is a checklist, not a queue​

The wizard has a step sidebar on the left and you can click any step at any time. It opens on the first step you have not completed, which is a convenience, not a constraint — if you are waiting on somebody else for ERP credentials, go and do the users step and come back.

The header carries a progress bar, a percentage, and "N of M steps complete". The step list itself comes from the server, so what you see is your tenant's checklist rather than a fixed script.

Required and optional are different, and only one of them blocks you​

An optional step shows an Optional badge beside its name and a Skip for now button at the top of the step. Skipping records the date and moves you on — "you can complete it later in Admin", which is where those settings live permanently. The Skip for Now beside Save & Continue at the foot of an optional step also moves you on, but marks the step completed rather than skipped.

A required step has no badge and cannot be skipped: it completes only when what it asks for is saved. Press Save & Continue; if something is missing, the wizard stays on the step and says what, for example This step is not finished yet. Still needed: which system keeps your books. Company info needs the company name, Divisions at least one division, and ERP connection the system that keeps your books. If another system keeps your books, ERP credentials needs its connection details, Initial data sync a first sync that brought in financial data, and Chart of accounts at least one mapped account; if your books are kept in Arcvue, those three have nothing to read and never hold you up. Completed steps carry a green tick and the date; skipped ones carry an amber marker and the date.

When a step is refused, the message is the server's own reason — what happened and what to do next — not a status code. Read it before retrying; a refusal that names a missing registry or a busy one is telling you to wait or to fix a setting, not to press Save again.

The steps​

StepWhat it does
Company infoFiscal year, organization type, and the basics that frame everything else. The organization type decides which screens you see; see below.
DivisionsThe parts of your business Arcvue reports on separately. A business that runs as one unit needs just one, and the step starts with it filled in; see Divisions below.
ERP connectionWhich accounting system you run. No credentials are entered here — that is the next step.
ERP credentialsThe sign-in for that system, on its own screen. If your ERP connects through its own sign-in, there is nothing to type: the connect button, which carries your ERP's name, sends you to your ERP's own sign-in page to approve the connection.
Initial data syncThe first pull from your ERP, started with Start Initial Sync. Later steps read what this brings in. It is complete only when the pull brought in financial data; a sync that brought nothing says so, The sync finished and no financial data arrived. Check the connection details, then start it again., with the button to start it again.
Capability matrixThe Onboarding Conformance Engine's read of your setup. It runs after each ERP sync, so if it looks empty, complete the sync step and come back.
Chart of accountsGL mapping. See below — this is the one that matters. A business keeping its books in Arcvue starts here from a starter chart; see Starting from a chart of accounts.
Indirect ratesWhether your indirect rates compute on your cost pools, and the way to set them up. Government contractors only: a commercial business does not get this step.
ContractsReview of the contracts the sync brought in.
Forecast year setupWhich year you are forecasting and over how many years.
UsersThe people who will use Arcvue, and their roles.
Treasury configCash and banking setup, and your payroll schedule. See The treasury step below.
EmailWhere Arcvue sends what it sends.
Review / Go LiveThe checklist and the launch button.

The organization type decides which screens you see​

The Organization Type on the company step is not a label. A government contractor sees every screen. A commercial business does not see the screens built only for government contracting, such as indirect and provisional rates, the incurred-cost submission, cost pools and government property, and its wizard has no Indirect rates step. Its books read in commercial terms too: the P&L titles its indirect sections Fringe Benefits, Overhead and Operating Expenses rather than as rate pools. Nothing is deleted when the type changes: change it later in Settings → Company → Profile and those screens come back with everything they held. A company that never chooses reads as a government contractor.

What the connection step will ask you for​

The picker is Arcvue's catalog of the accounting systems it reads from, and it opens on the one your tenant already has. Arcvue Accounting comes first: choose it if you keep your books in Arcvue, and the credentials step has nothing to ask. It says "Nothing to connect for Arcvue Accounting" and you move on. A manual CSV upload works the same way. Arcvue's demo dataset is not offered here.

The credentials step is the Accounting system credentials form. It is the same form as Settings › Integrations & automation › Connections, which is where you enter a rotated password later; the form always opens empty, because Arcvue never shows a stored credential back.

For any other system, what the credentials step asks for depends on which one you choose, and the shapes differ:

  • some connect by database credentials: host, port, database, username and password;
  • some by API endpoint: a URL, an API key, and a username and password;
  • one connects by sign-in approval rather than a stored password: you authorize Arcvue from inside your own accounting system and type nothing.

Check which shape yours uses before you sit down to do this, because the third kind needs no credentials at all and the first two need details you may have to ask someone for.

Selecting nothing and continuing is refused: the step tells you to pick one rather than saving an empty choice.

The sign-in-approval system is the easier one. Instead of typing a credential you are sent to that system's own secure sign-in and returned here. Once connected, the same screen offers Disconnect, which breaks the link. Disconnecting does not delete anything Arcvue has already pulled in; it stops future syncs.

Divisions​

A division is a part of your business that Arcvue reports on separately: revenue, margin and pipeline each break down by it. If your business runs as one unit, one division is the right answer. The step opens with a single row named after your company, and Save & Continue is all it needs.

Each row has a name and an optional code. The code is how your ERP or an import refers to the division; leave it blank and Arcvue makes one from the name. Add division adds a row, and a row you have not saved yet can be removed.

A saved division keeps its name and code. Pipeline rules, people and imports refer to a division by its name, and opportunity routing by its code, so the step shows a saved division as it is. To rename one, add the new name and make the old one inactive. A saved division is never deleted either: contracts may already point at it, so a division you stop using is made inactive instead: clear Active and save. It stays listed, so turning it back on later keeps its history attached. The step will not save two divisions with one name, or a set with none active, and it says which rule a row breaks before you press the button.

The setup checklist's Divisions & Entities Configured item and the System Health divisions check read the same divisions, so both clear the moment you save.

After setup, the same list lives at Settings → Company → Divisions (anyone whose role holds the Company settings group). It is the step's own editor, so the same rules apply: add a division, clear Active to retire one, or change How it wins new work, then press Save divisions. The button stays disabled, with the reason beneath the list, until every row has a name, no name or code repeats, and one division is active.

The treasury step​

This is where the cash forecast learns when you pay people. Payroll Cadence offers the two schedules the forecast models:

  • Semi-Monthly: two fixed pay days a month, entered as Pay Anchor Day 1 and Pay Anchor Day 2, each from 1 to 31. A day past the end of a short month means that month's last day.
  • Bi-Weekly: no days to enter. Paydays follow your most recent payroll run once payroll data arrives.

ACH Lag (days), Starting Cash Balance, Min Cash Threshold and Revolver / LOC Limit complete the step. The first save creates your treasury settings and later saves update them. A pay day outside 1 to 31 is refused rather than saved.

The tables you will be reading​

Five steps put a table in front of you. The columns are worth knowing before you get there, because several of them are decisions rather than readouts.

Capability matrix — what the conformance engine found after the sync.

ColumnWhat it is
ModuleThe area of the platform being assessed.
StatusWhat the engine concluded.
HistoryHow much historical data arrived for that module. Thin history is not an error; it changes what the forecast can do.
RequiredWhether that module needs to be satisfied before go-live.

Chart of accounts — one row per GL account.

ColumnWhat it is
CodeYour account number, as it exists in your ERP. Arcvue does not invent or renumber these.
NameYour account name.
RoleThe decision. Which Arcvue semantic category the account maps to — this is the field the whole step exists for.
ActiveWhether the mapping is in force. Deactivating a row retires the mapping without deleting the account.

Indirect rates — what your indirect rates compute on. The step shows the same line as Settings → Rates & compliance → Cost pools: green when your fringe, overhead and G&A rates compute on your cost pools, with each pool named; amber when they do not, with the reason. Open Cost pools takes you there to add pools or change the accounts each one collects; the step itself changes nothing. A company whose books are kept in another accounting system is told that its sync brings in the pool definitions the rates use.

Contracts — what the ERP sync brought in.

ColumnWhat it is
Contract #The contract number as your ERP holds it.
NameThe contract name.
DivisionThe organizational unit it belongs to.
Start / EndPeriod of performance.
CeilingThe contract's funded ceiling.

Read this table rather than skim it. It is the first chance to notice that a contract came across with the wrong division or a missing end date, and both are much cheaper to fix here than after the forecast has been built on them.

Users — the people you are adding. Add User opens a New User card in place: Username, Display Name (saved as LAST, FIRST in capitals, however it is typed), Email, Role and Password. Create adds them; Cancel closes the card without adding anyone. Adding a user here is the same action as adding one later in Admin — the step exists in the wizard so a new tenant is not left as a single login.

ColumnWhat it is
UserTheir username.
EmailTheir address — this is where an invitation or a password reset goes, so a wrong one strands the account.
RoleWhat they can reach.
ActionsEdit and remove, per row.

Email — the Email Recipients field on the email step is who receives Arcvue's scheduled reports. It takes a list, and it is separate from the user list above: being a user does not subscribe you to anything, and a recipient does not have to be a user.

When the first sync finishes it reports what it moved: how many tables were synced, the total row count, and a table listing each table against its Rows.

Read the per-table Rows figures, not just the total. A sync that moved a large total can still have brought back zero rows for one table you depend on, and the total is exactly where that hides.

The one step to slow down on​

The Chart of accounts step opens with a panel that says, in the product's own words, "Before you begin — this step matters more than any other."

It is right, and the reason is worth internalizing: GL mapping drives every financial calculation, forecast, indirect rate, and AI insight in Arcvue. A miscategorized account does not affect one chart — it cascades. Arcvue asks you to set aside about 25 minutes and offers help at info@arcvue.ai before, during or after the step.

The step gives you auto-detect and suggestions to work from. Treat both as proposals: they are a starting point that saves typing, not a decision that has been made for you. You are the one who knows what your accounts mean.

When your books in Arcvue begin​

The Chart of accounts step also asks When your books in Arcvue begin: the first day Arcvue books your transactions. Everything dated on or after it reaches your ledger; anything earlier stays out, and the balances you carry in on that day are entered as opening balances. Until a date is saved nothing posts, so statements and forecasts read empty.

Books begin on is pre-filled with the first day of your earliest accounting period. A new company has no accounting periods yet, so the field starts empty: enter the first day your books in Arcvue begin. Save date states it; Change date moves it while nothing has posted. Once transactions have posted the panel shows the date as fixed, because moving it would leave postings on the wrong side of it.

The balances you carry in go on the Opening balance sheet, lower on the same step, below Accounts your ledger posts through: each account's balance at close of business the day before your books begin. Upload it or enter it line by line, check it, and post it once debits equal credits; a company with nothing to carry in records that instead. The same panel is on Settings › Company › Profile, and the Settings guide describes each control.

Accounts your ledger posts through​

Every entry has two sides. When a payment leaves the bank or a bill arrives, Arcvue books the other side of the entry to an account you name once, in Accounts your ledger posts through on the Chart of accounts step: the operating bank account, accounts receivable, and accounts payable for billable and other costs. Until those four, marked Required, are set, bank, card and bill activity cannot post, and the panel names what is missing. The others -- unbilled receivables, labor revenue, deferred revenue, employee reimbursements, accrued subcontractor costs, subcontractor costs, interest income -- are needed only by the work that uses them.

Subcontractor costs is the expense account approved Subcontractor Portal hours and subcontractor invoices book to. Name it when your chart calls that account something other than "Subcontractor Labor"; until you do, Arcvue looks for an expense account with that name, and a Portal invoice it cannot price is refused. If your books carry an account consolidation for subcontractor labor, the consolidation decides the account for each date and this setting is not used.

Each list offers only active accounts of the right type from your chart. Press Save accounts to keep them. An account is fixed once transactions have posted to it, because moving it would split one balance across two accounts. A business with more than one company sets the bank and receivable accounts for each. Loading a starter chart fills these in for you.

Starting from a chart of accounts​

A business that keeps its books in Arcvue begins with an empty chart of accounts, so for that tenant the step opens with Start from a chart of accounts: four starter charts, with the one built for your organization type chosen for you.

Starter chartBuilt forWhat it carries
Government contractorGovernment Contracting, Aerospace & DefenseDirect costs by type, the fringe, overhead and G&A pools your indirect rates are built from, and the unallowable costs you keep out of them.
Technology companyTechnologySubscription and services revenue, deferred revenue, cloud and software costs.
Professional services firmProfessional ServicesServices and reimbursable revenue, subcontractors and client expenses.
General businessOtherSales and the operating costs of any small business.

Load chart creates the accounts, opens the current year's twelve monthly periods if the tenant has none, and sets the accounts Arcvue posts cash, receivables, payables and deferred revenue to, unless you have already set your own. It then starts a sync, so the new accounts reach the mapping list on the same step, where auto-detect proposes their mappings.

Three things are deliberate:

  • It loads once, into an empty chart. Once any account exists the panel is gone, and a second load is refused. A template merged into a chart you have started would sit beside it as a second set of accounts for the same things.
  • It is only for books kept in Arcvue. A tenant on another ERP gets its chart from that system with the first sync, and is never offered one.
  • One number means one thing in every chart. 8130 is Software Subscriptions whichever chart you load. A commercial chart has no direct-cost accounts, so no operating cost asks which contract it belongs to.

After it loads, the chart is yours: rename, add or retire accounts on the Chart of Accounts page.

Going live​

The Review step shows three counts — Completed (of the total), Skipped (optional), and Remaining — then the full checklist with a date against everything finished or skipped.

Underneath, one of two banners:

  • Red: "N required steps still incomplete: …. Complete these before going live." Go Live is disabled while this shows, and the banner names exactly which steps.
  • Amber: "N optional steps not yet completed. You can still go live and configure these later in Admin, or skip them now." Go Live works.

Go Live launches the tenant and takes you to the dashboard. Only required steps gate it. An amber banner is a note, not a blocker.


Part 2 — The Questionnaire​

Setup → Questionnaire. Twenty-eight questions in six sections:

SectionWhat it calibrates
Your BusinessHow the business is structured.
Cash and TreasuryThe cash-flow forecast — how fast you bill, how fast you get paid.
Books and Close DateYour close date decides which numbers are actuals and which are forecast.
Growth and PipelinePipeline and forecast targets.
Debt and CovenantsCovenant tracking, if you have bank financing.
People, Bonuses, and ReportingBonus structure and who sees what.

It only asks what it does not already know​

The Questionnaire is data-aware. A question whose answer is already in your data is not asked again — so the length of your Questionnaire depends on how much the ERP sync already told Arcvue. If every section is already populated, you get a "fully configured" screen instead of a form. A short Questionnaire is a sign the sync worked, not a sign something was missed.

It will not overwrite what you have​

Certain areas — debt, covenants, bonuses, EBITDA, email, growth, and bank balance — are protected. Where those are already populated, the Questionnaire shows them read-only, as a confirmation rather than as an editable field. It is showing you what it will use; it is not inviting you to re-enter it.

If one of those values is wrong, change it on the screen that owns it, not here.

The close date is the answer with the longest reach​

Of the twenty-eight, the close date is the one that changes the most downstream. It is the line between actuals and forecast: everything on or before it is treated as real, everything after it as projected. Getting it wrong does not produce an error — it produces confident numbers of the wrong kind.


Move through the sections with Back and Next. Skip this section moves on without answering it, and the last section's Save Configuration saves your answers. In the email section, Add recipient adds a row for each person who gets the automated reports.

The two ways the questionnaire ends, and why only one lets you go back​

"Arcvue is configured for your business" is the ordinary finish: you worked through the questions and Arcvue has your answers. It offers Go to Dashboard and Go back and change something, which returns you to the first question with everything you entered still there.

"Your platform is fully configured" is different, and it is the one that surprises people. It appears when every configuration item is already set — so the questionnaire has nothing to ask and does not run. It says so plainly ("All 28 configuration items are already set. No questionnaire needed") and offers only Go to Dashboard.

That screen is not an error and you have not skipped anything. It is the same principle as It only asks what it does not already know, taken to its limit — there is no Go back and change something because there are no answers to change. Everything it settled is still editable in Admin whenever you want it.


Part 3 — When something looks wrong​

SymptomWhat it means → what to do
"No ERP selected. Go back to step 2 to select your ERP system."The credentials step cannot run before the connection step. Use the sidebar to go back.
The capability matrix is emptyIt runs after an ERP sync. Complete Initial data sync first, then return — the step says so itself.
Go Live is grayed outRead the red banner directly above it: it names the required steps still outstanding. Optional steps never block it.
I cannot tell whether a step is requiredAn optional step carries an Optional badge beside its name. A step without the badge is required, whichever buttons it shows.
A required step will not finishThe message names what is still needed. Save that, then press Save & Continue again.
I skipped something I now needEverything skipped is configurable in Admin afterwards. Skipping is deferral, not refusal.
The Questionnaire barely asked me anythingIts questions are suppressed where the data already exists. Expected after a good sync.
A Questionnaire value is shown but I cannot edit itIt is one of the protected areas. Change it on its own screen; the Questionnaire will not overwrite it.
I sent someone a link to step 3 and they landed on step 1Working as built — the address does not carry the step. Send them to Onboarding and name the step; they click it in the sidebar.
A GL account is mapped wrongly and things look strange everywhereExpected, and it is why that step carries its own warning. Correct the mapping — it is not a one-time-only step.

One-line summary​

Work the Setup Wizard in any order you like — only required steps gate Go Live, optional ones can be skipped and finished later in Admin — and slow down on Chart of accounts, because GL mapping cascades into every calculation, forecast and rate in the platform; then answer the Questionnaire, which asks only what your data has not already told it, never overwrites your protected values, and whose close date is the line between actuals and forecast.

  • Signing in, and the four ways a password gets changed → Account Access (Platform user guides)
  • Users, roles, and permissions after setup → Access and Users
  • Tenant settings after go-live → Configuration
  • Cost pools and the rate build-up → Cost Pools