Skip to main content
Checked against the product · 2026-10-04

Contract Documents — Controller Guide

This is where an executed PDF — a base award, a modification, an option exercise — becomes a contract record your books can trust. You upload the document, an extractor reads it, and you review the extracted terms against your existing data before accepting.

The mental model: AI proposes, you confirm, the system locks. Nothing downstream — invoicing, funding alerts, revenue recognition — sees a contract until you accept it here. Treat this page as the single controlled door every contract fact walks through.

For: controllers and contract administrators · Time: ~15 minutes · You'll need: the executed PDF, and to know what the document is (award / modification / option exercise) so you can sanity-check what the extractor decided.

How to access​

Contracts → Contracts, then the Upload & review proposals link under the title — or /accounting/contracts/proposals. The header reads Contract Documents, subtitled "AI-extracted contract documents pending human review."


Part 1 — Two things to be clear about before you upload​

Use the executed document. Extraction reads what is in front of it; it never invents terms. A draft or unsigned copy will feed wrong numbers into invoicing and revenue recognition, and it will do so confidently.

Extraction alone changes nothing. An uploaded-but-unaccepted document is invisible to every other module. Accepting is the act that writes the contract row and unlocks the downstream engines. So an extraction sitting in the queue is not a half-finished contract — it is a proposal nobody has agreed to yet, which is exactly the intended state.


Part 2 — The queue​

The queue is sorted lowest-confidence first by default, and that is the whole point of the page — the extractions that need your eyes float to the top rather than being buried behind the easy ones.

ControlOptions
Status tabsPending (your work queue), Accepted, Modified, Rejected, All
Actions dropdownAll actions, New contracts, Modifications, Option exercises, Subcontract agreements, Rate cards
SearchBy contract or subcontract number, agency or subcontractor

Each row shows Contract #, Counterparty (the agency on an award, the subcontractor on an issued subcontract), an Action badge, a Confidence bar with percentage, a Status badge and the Extracted date. Anything under 70% confidence grows an amber Needs Review chip and an amber left edge. Column headers sort; click again to flip.

Upload is Upload PDF (top right), PDF only. Extraction takes roughly 30 seconds; use Refresh if the row has not surfaced yet.


Part 3 — Reviewing a document​

Click a row to open the review drawer. It is headed Contract Document, or Subcontract Document for a subcontract you issued; a rate card opens its own review, described in the Contract Register guide.

Read the header and any warnings first​

The drawer top gives the Document type, Action badge, Confidence, Status, Created, and once reviewed, Reviewed by and Notes. A one-line statement says what accepting will actually do — establish the contract, apply a modification, or record an option exercise.

If a Validation warnings panel appears, work it before you accept. Understand each one, or resolve it. A warning you accept past is a warning nobody will see again.

Some of those warnings come from the government's own record of the award. For a prime contract, task order or modification, Arcvue looks the contract number up in FPDS, the federal procurement data system, and compares the document with what the government reported: the agency, the NAICS code, the set-aside, the awardee's UEI, the date the award took effect against the start of the period of performance, and the value with all options. On a modification it also checks the amount obligated, to the cent, the total obligated after it, and the modification's date. Each disagreement is a warning that begins FPDS reports and gives both figures. Three warnings are about the lookup rather than the document:

  • FPDS has no award record for … — check the number. A new award takes days to appear in FPDS.
  • FPDS has the award … on file but no action yet for modification … — the government has not reported the modification yet, so its figures were not checked.
  • FPDS could not be reached … — the check did not run, so the panel says nothing about the award record either way.

A subcontract, consulting agreement or teaming agreement is never looked up: FPDS reports prime awards only.

A modification that sets labor rates on a Service Contract Act contract but names no wage determination revision is held with a warning. An approved equitable adjustment usually reaches you this way: the modification prices the new rates and never says which revision of the determination they adopt. Find the revision in the equitable adjustment request the new rates answer (its proposed rate matches the modification's rate) and enter it in Wage determination revision before you accept. Arcvue then moves the contract to that revision from the modification's effective date, and SCA Health & Welfare prices each day at the revision in force. If the new rates do not change the determination, leave the field blank and accept.

A contract that carries several wage determinations (a multi-state contract, one determination per work location) gets a different warning, because one field cannot say which determination the revision belongs to. Accept the modification, then state the revision for each determination it changes on Accounting > Compliance > SCA Health & Welfare, effective on the modification's date. The revision you enter in the drawer is also recorded when the contract record itself names no determination: Arcvue uses the one determination the contract's history has in force on that date.

Check the extracted fields​

While the document is Pending, correctable scalar fields are editable inputs, and each field you touch takes an amber border so your edits are obvious — useful when you come back to a drawer you started earlier.

Key fields — contract number, contract type, funded value, period-of-performance dates — always render even when the extractor missed them. A blank required field is not an omission in the UI; it is the thing you are here to fill in.

Document type is yours to correct. The Document type row is a choice of Award, Modification or Option exercise. The reader decides first; if it read a modification as an award, choose Modification, fill in its Modification number, and use Accept with corrections. An award replaces the contract's own terms — its ceiling, its period of performance, its rate card — so Arcvue refuses to accept as an award a document whose file name names a modification (P00003, M00002, MOD0004); the message names the number it read. A rate card or a subcontract keeps its own review and offers no choice here.

A rate must name its labor category. If the rate table carries a row named for a period rather than a category ("OY2 Hourly Rate", "Option Year 3 Overtime Rate"), the accept is refused and names the rows: in the rate table, type the labor category each one prices (Legal Clerk, say), then accept. A rate named for a period would otherwise become a category of its own that every later period is asked to price.

The rate table is correctable, one misread at a time. Four columns on the LCAT list accept edits while the document is Pending, each taking the same amber border as the scalar fields:

ColumnWhat it is
Labor categoryThe role the contract prices — the name the invoice will carry. A subcontract PO often names the person; enter the role. If the document only names people, the role lives in the task order or agreement it references.
CodeThe customer's code for that category, if the document assigns one — blank is normal. It travels onto invoices.
Rate ($/h)The billing rate per hour from the document. This is the only source a billing rate ever comes from. Correct a misread digit; never enter a rate the document does not state.
HoursThe hours the document funds or caps (rate × hours = the line's value). Blank when the document states none, and a T&M ceiling is enforced against it at invoicing.

CLIN on the same table is not editable — if the reader put a category on the wrong CLIN, fix it after accept on the contract's billing surface. Neither is Confidence, which reports how sure the reader was: below 0.80 the row is flagged for review after accept. Confidence describes the extraction, not the document — check the rate and hours against the page whatever it says.

Editing a row is correcting a misread, not authoring the schedule. The other nested collections — CLINs, billing milestones, option periods — remain non-editable, and to change a whole rate schedule you upload the corrected schedule document rather than hand-patching rows. That is what keeps a rate schedule traceable to a document, which is the property that makes billing defensible later.

A collapsible Show raw extraction (JSON) section is there if you need to inspect the structure.

Cross-check against Arcvue — this is the step that catches real errors​

The Compared with Arcvue panel puts the extracted PDF value beside the contract as Arcvue holds it today and tags the agreement. Its columns are Field, Extracted (PDF), Current in Arcvue and Status.

Current in Arcvue is not something to fix. It is the contract before this document; accepting the document is what updates it. If the document side is wrong, correct it in the fields above or resolve the row in the panel.

TagMeaningWhat to do
matchThe document equals ArcvueNothing — this field agrees
mismatchThey differ and one of them is wrongResolve it in its row (below)
updates on acceptA modification or option exercise moves this value, as it shouldCheck the new figure; nothing to resolve
Arcvue emptyThe document has a value, Arcvue had noneConfirm it — accepting fills the gap
extractor missedArcvue has a value, the document reading found noneCheck whether the field belongs on this document
for informationShown so you can see it; accepting never writes itNothing

Resolve a mismatch where it is. Under each mismatch row choose Use document, Keep current, or Type a value and enter the right figure. Your choice becomes that field's correction; the panel counts how many are resolved, and once all are, accept with Accept with corrections. Auto-accept matches stays off while any mismatch is open. Your corrections are checked together when you accept, never one at a time, so correcting the funded value before the contract total is fine as long as both go in the same acceptance. If funding would still exceed the contract total, the drawer says so once, at the Ceiling row: Funded ($X) is more than the contract total ($Y). If the contract total is wrong, correct it first.

On a modification or option exercise, both columns are cumulative. The document column shows what the contract will read after you accept, not the amount the document changes it by. Some customers' SF-30s print only the exercised period's value on the total line; the row then shows that figure as printed: ... (one period only) and says what Arcvue does with it: an option already on the contract's schedule is already in the base-and-options total, so the ceiling stays; an option not on the schedule adds its value; a modification moves the ceiling only by a change it states. A one-period figure never replaces the contract's ceiling. Funded value compares cumulative to cumulative, so a funded mismatch on a modification means the document's running total does not equal Arcvue's funded value plus this document's obligation — usually an earlier modification Arcvue has not received.

The contract type on a modification is for information. Arcvue bills on the type set on the contract, and a modification never changes it, so a difference there is shown and never blocks you.


Accepting an issued subcontract​

A row whose Action badge reads Subcontract Agreement is a subcontract you issued, loaded from its signed PDF on the Procurement page (Load agreement from PDF). It is the backfill path for an agreement that was in force before Arcvue held your subcontracts; a new subcontract is typed in on Procurement.

The review works the same way — read the header and warnings, check and correct the extracted terms — with two differences. There is no comparison with Arcvue and no Auto-accept matches: a subcontract you issued has no FP&A counterpart. And Accept stays disabled until you name the party under Name the party: choose the Subcontractor from your register (the document's own name for the company is shown beside the picker so you can find the right entry — Arcvue never matches the two for you) and, if the agreement sits under one of your prime contracts, enter its Prime contract id. Accepting creates the subcontract agreement rather than a contract; the drawer then shows the agreement number with a link to Procurement, where it is listed under Subcontract agreements with its clause flags still Not determined.

Accepting a rate card​

A row whose Action badge reads Rate card is a prime's labor rate card spreadsheet, read on a contract with Read a rate card on that contract's Billing tab. Opening it here or there brings up the same Rate card drawer, which shows what accepting will do rather than extracted fields.

It lists every rate on the card, period by period: Labor category, On the card, On the contract now and Accepting. A rate equal to the contract's is grayed and writes nothing; only a different or new rate changes the contract, and only for the period the card states. On the contract, not on this card lists rates the contract already holds that the card does not mention -- accepting leaves them alone. Sheets not read names any tab the reader could not use.

Select Accept rate card to place the rates, or Not a contract action with a reason (a draft the prime replaced, say). Nothing else about the contract changes either way.

Part 3b — The outcomes: accept, correct, or set aside​

Reject is for housekeeping only. A wrong extraction is corrected in the drawer and accepted — the correction is recorded against the document and is what the reader learns from. Two other controls exist:

  • Reject — on a Pending document, to keep the queue clean. It first shows a note: if the information it read is wrong, do not reject it — correct the fields and accept. Choose a Reason (required): a duplicate of a document already in the queue or on file; a modification that was superseded, or one this contract did not expect; uploaded in error; or not a contract action (an intent letter, an attachment, another entity's document). Add a note if you like and click Confirm reject. The reason is kept on the record, the document leaves Pending marked with it, and nothing in the register moves. Cancel puts the button back without recording anything.
  • Reopen — on a document that was rejected before rejection was retired, or set aside by mistake. Type why in Reason for reopening and click Reopen; it returns to Pending with its history intact so you can correct the fields and accept.

Part 4 — When something looks wrong​

"Confidence is low but the fields all look right." Accept it. Confidence is a prompt to look, not a verdict — a clean scan of an unusual layout can score low and still be correct.

"Confidence is high and a field is wrong." Fix it in the drawer. High confidence is not a reason to skip the read; it is a reason the read is quick.

"I can't edit the LCAT rates." By design. Upload the corrected rate schedule document instead, so the rates trace to a document rather than to a hand edit.

"I uploaded it an hour ago and nothing downstream sees it." It has not been accepted. Extraction alone is inert.

"The Action badge says modification and I expected a new contract." Check the PDF. If the badge is genuinely wrong the document may be the wrong file — that badge drives what accepting does, so do not accept past it.

"A required field is blank." The extractor missed it and the field rendered anyway so you could fill it in. That is working as intended.


One-line summary​

Upload the executed PDF, and the extractor proposes the contract terms. The queue floats lowest confidence first; anything under 70% is chipped Needs Review. Work the Validation warnings, fill any blank key fields, and use the Compared with Arcvue to find where the document and your record disagree — then Accept, which is the moment the contract becomes real to invoicing, EVM and funding alerts. Rate schedules change by uploading a document, never by hand.