Skip to main content
Checked against the product · 2026-10-06

Unbilled Receivables — Controller Guide

What each contract has earned that has not yet been invoiced -- hours worked priced at the contract's billing rates, a fixed-price contract by its billing schedule -- by the month the work was done, aged, with the ledger's unbilled balance beside it. It is the report a lender asks for with every borrowing-base submission against a line of credit, and the one a controller reads to see what is sitting between the work and the invoice.

Who uses it: the controller preparing a borrowing-base certificate, and anyone who needs to know how much is earned and not yet billed, by customer and by month.

Where it lives: Accounting -> Unbilled, under Billing & Revenue in the sidebar (/accounting/reports/unbilled). It is also in the Reports library at Accounting -> Reports under Compliance & exports as Unbilled Receivables, where you can download the workbook, and the Command palette finds it by name.

Before You Start​

  • The figure for each month is earned less invoiced, over the last six months through the as-of date. A fixed-price contract earns its billing schedule installment (its hours are cost, not billing) and, for the month in progress, the fraction of the installment that the days elapsed represent. A contract billed on a day other than month end counts those days from the day after its last invoiced installment: invoiced through the 27th, on the 15th it has run 18 days of a 30-day billing period, not 15 of the calendar month's 31. With no schedule it earns the option period divided by twelve. An effort-based contract earns hours worked times its contract billing rate, priced exactly as an invoice prices them, employees and subcontractor portal hours alike. A milestone contract earns milestones completed and not invoiced.
  • Invoiced is the issued invoices whose billing period ends in the month. A draft is not a bill: drafts are shown on their own line and never reduce unbilled.
  • A month nothing can price, on a contract that has issued invoices, is measured by its draft invoice when the bookkeeper has drafted one, else by its last issued month's invoice, and flagged. Load the billing schedule or the category assignments on the contract to replace that estimate with a measurement.
  • The unbilled-AR account role must be configured in the tenant's structural accounts for the ledger balance to appear. Without it the contract rows still compute; the ledger balance reads "role not configured".
  • An entity the tenant has declared it does not keep books for (entities_not_kept) is left out of every total; rows keep their entity for drill-down.

Reading the position​

  • As of reads hours, schedules and invoices as they stood on a date (default today). Last month end jumps to the previous month's last day, which is the figure a submission wants: the month is closed and nothing is measured by days elapsed. Today clears it. Download workbook saves the same report as four sheets.
  • Unbilled is every contract's earned-less-invoiced, summed where positive. This is the borrowing-base figure.
  • Estimated says how much of that total rests on an estimate rather than a measurement: days elapsed on a schedule for the month in progress, or a draft or last invoice where nothing could be priced.
  • Billed ahead is issued invoices whose billing period ends after the as-of date -- cash billed before the work -- shown beside the total and never subtracted from it. A month invoiced for more than it measured is not billed ahead (invoices carry travel and ODC lines the report does not price); the month reads zero and says by how much.
  • Ledger balance is the unbilled-AR balance the authoritative books carry through the as-of month -- the imported ledger before the ledger boundary, Arcvue's own books from it -- with the difference from the report underneath. The books recognize a fixed-price month in full at month end and effort-based work when the invoice is cut, so inside a month the two differ by design; the notes say how far and why. Use the report for the borrowing base and the ledger for the tie.
  • Drafts, unissued is invoices priced and not yet issued for months not yet invoiced. A draft on a month already invoiced is a stale or template draft and is named in the contract's notes rather than counted.
  • Hours not priced is hours worked that the invoice engine could not price: no category assignment for the person, no rate card on the contract, or an ambiguous assignment. They are counted and named on the contract and are outside the total, so the total understates by exactly those hours until the contract is fixed. Fix the assignment or the rate card on the contract; the figure falls the next time the report is read. A contract marked Manual entry only is billed by hand: its hours are cost you track, not hours you bill, so they are never counted here and its months stand on the invoices entered for it.
  • The aging strip buckets unbilled by days since the service month ended: Current, 1-30, 31-60, 61-90, 90+.

By contract​

One row per active performing contract whose period of performance reaches the window, sorted by unbilled. Ordering vehicles (IDIQ, BPA, schedule) carry no performed work and are not listed.

  • Customer is the client the contract names, else the contract's name made readable. Contract, Entity and Type are the register's; the type is the billing type, and a fixed-price type is the one measured by its schedule.
  • Invoiced through is the billing period end of the latest issued invoice on or before the as-of date, or never. Every month in the window is still re-priced and netted against its own invoices, so an older month under-invoiced by a few hours shows regardless.
  • Hours is the window's hours charged to the contract, employees and subcontractors alike; Unpriced is the part no rate could price.
  • Earned, Invoiced, Unbilled and Billed ahead are the contract's totals across the months shown. Oldest month is the earliest month with an unbilled residual. 1-30 through 90+ split the contract's unbilled by age.
  • Estimated is the part of the contract's unbilled resting on an estimate. Drafts is its priced, unissued invoices for months not yet invoiced.
  • Flags: Never invoiced (no issued invoice yet; the window opens at the period of performance), Hours not priced, Not priceable (a month with no rate path and no invoicing history; its hours are listed), Days elapsed (a scheduled month in progress), From draft and From last invoice (nothing could price the month; the draft or the last issued month's invoice stands for it), Schedule gap (an invoiced month with no installment row; the invoice stands for it -- load the row), Billed ahead, Unapproved hours (counted, awaiting supervisor approval), Pricing refused (the invoice engine refused the month; the basis column says why).
  • Basis says where the figure comes from: hours at the contract rate, the billing schedule, days elapsed on it, the option period, completed milestones, or a draft or last invoice. The notes under it name every month that needs attention and what to fix.

By contract and month​

Every (contract, month) pair behind the contract rows, with its own Hours (unpriced hours in brackets), earned, invoiced, unbilled and billed-ahead figures, its days since month end and bucket, and a Kind column saying whether the row is Measured or an Estimate. The Contract selector opens on All contracts and narrows the grid to one contract when you pick it.

Ledger tie​

The report's unbilled, billed ahead and the ledger's unbilled balance per entity, with the difference. The sentence above the grid says which book answered for which months.

Common mistakes​

  • Measuring a monthly fixed-price contract by hours worked: it earns by the passage of time, so its month in progress is the elapsed fraction of its schedule, however many hours were worked.
  • Reading a zero on a contract with hours as nothing earned: look at Unpriced and the flags. A zero with hours means no rate could price them, and the fix is on the contract, not in the report.
  • Expecting the ledger to tie inside a month: it ties at month end, once the invoices are cut and the fixed-price months are recognized.
  • Treating an invoice dated mid-month as billing only to that day: an invoice bills the month its billing period ends in. If the period on the invoice is wrong, record it on the invoice.
  • Expecting an ordering vehicle on the list: work is performed on the task orders placed under it.